03/25/2020

Today we had ZOOM meeting with Dr. Furman and Mr. Ron to give an update on our project. We provided the new date with new tasks assigned for each team member. We agreed to keep up with our new schedule so that we can finish with research and finish our report on the 11 Meter Track. * attachment is the PowerPoint slides of our updated Gantt Chart:

03/18/2020

Today we had the ZOOM meeting with professor Furman, Mr. Ron and everyone in our class. During the class time, Dr. Furman mentioned that we can not have any hardware work done inside or outside the campus due to COVID-19. The plan for our project changed from fabricating the 11 Meter Track to study and research the environmental effect of our project. We still work and finish our 3D modeling, but unfortunately, we won't be able to fabricate what we are modeling. Our team is working towards the new goal that is set up for this project in this semester.

03/11/2020 - NO Class

Due to COVID-19 our campus was closed and we had to work remotely for our course work and the project. Our teammate connects via facetime to discuss the changes we have base on the current situation. We set the new timing and plans for future work till we find more information for the current situation.

03/04/2020 - Conference day

Today all ME195B students had to meet at Engr 189 for the conference that we had. After the conference, there was a short multiple-choice quiz base on the topic of the conference. After the meeting, all teams headed over to their project room. We arrived at the curt room around 3:20 to start working on our project. We spend about an hour and were able to get some modeling and fabricating done before we leave for the day.

02/26/2020 - 1st Presentation

today we had our 1st presentation for this semester. * attachment is our presentation slides.

02/19/2020

Today our team had a short meeting with Dr. Furman for our presentation for next week. We wanted to make sure that we deliver the important update and report about our project. After the meeting, our team met in the 11 Meter Track room. first, we finished the 3D modeling, and then we started working on presentation slides together. Towards the end, we took some pictures of our working room, so we can add them to the 5S slide for the reports.

02/12/2020

Today we had a meeting with Dr. Furman, Mr. Ron and Eric to discuss our plan to finish our project by Spring break. We provided a PowerPoint explaining our plan for our project. Our plan is to have everything done by Spring break, and after we will test the bogie on the track. After our meeting, we came up with ideas about the switching mechanisms. Neeraj and Nina will be working towards designing these switches. We will provide our switches mechanism design in our first presentation. https://docs.google.com/presentation/d/1vggwoSwu3oJf-_LUwbvHQu4hb8Q7XkkCZs_T6FXiFc8/edit?usp=sharing